Skip to content

2. NZAA to NZCH / NZOH to NZCH

Sector Responsibilities

Raglan (RAN)

RAN is responsible for initial climb.

Ohakea (OHA)

RAN is responsible for initial climb.

Taranaki (NAK)

NAK is responsible for ensuring the separation of aircraft in the enroute phase of flight and issuing STAR clearance.

Kaikoura (KAI)

KAI is responsible for creating the initial sequence into NZCH.

Coordination

ADEP to RAN

Voiceless for all aircraft:

  • Assigned RFL; and
  • Tracking via IGBAT

OTMA to OHA

Voiceless for all aircraft:

  • Assigned RFL; and
  • Tracking via ABTOL

KAI to CTMA

Voiceless for all aircraft:

  • Assigned A110; and
  • Tracking via IPRAK or MESIX